Dashboard / Section 3 / 100 1BW CUT4 ACC 13E

Workplace deep-dive · 100 1BW CUT4 ACC 13E

Section Section 3 · 1 inspections analysed

RED · 66.7%
← Back
Compliance
66.7%
15 checks
Risk level
RED
Stable
Audits
1
Across 1 weeks
Failures
5
Repeat failures
0
KPIs failing 2+ times
Open actions
5
Closure rate
100%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

Are all the excavations, including bullnoses, supported to standard?
Waiting place to Development End
1 fails
!
Is the last line of primary support within standard distance from the end face?
Support Design
1 fails
!
Is the sidewall support vetical distance to footwall to standard?
Support Design
1 fails
!
Is the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)
Support Design
1 fails
!
Has all significantly damaged and/or corroded support units been replaced?
Support Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

5 open · escalate to Operations Manager

StatusKPISubtaskDueAge
OpenIs the last line of primary support within standard distance from the end face?Support Design2026-05-276d
OpenIs the sidewall support vetical distance to footwall to standard?Support Design2026-05-276d
OpenIs the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)Support Design2026-05-276d
OpenHas all significantly damaged and/or corroded support units been replaced?Support Design2026-05-276d
OpenAre all the excavations, including bullnoses, supported to standard?Waiting place to Development End2026-06-036d