Dashboard / 7 / 100 04W CUT 06 SAD 01W

Workplace deep-dive · 100 04W CUT 06 SAD 01W

Section 7 · 9 inspections analysed

AMBER · 88.9%
← Back
Compliance
88.9%
189 checks
Risk level
AMBER
Improving
Audits
9
Across 9 weeks
Failures
21
Repeat failures
5
KPIs failing 2+ times
Open actions
0
Closure rate
0%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

Is the excavation height to standard?
Mine Design
6 fails
Is the excavation width to standard?
Mine Design
4 fails
Are all faults demarcated?
Geology
4 fails
!
Is the sidewall support vetical distance to footwall to standard?
Support Design
3 fails
Is the latest Rock Engineering and Seismic Rating reports displayed on the notice board?
Waiting place to Development End
2 fails
!
Has all significantly damaged and/or corroded support units been replaced?
Support Design
1 fails
Are all breakaways supported as per the mine standard?
Waiting place to Development End
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

0 open · escalate to Operations Manager

StatusKPISubtaskDueAge
No open actions.