Dashboard / 7 / 100 04W CUT 06 SAD 04W

Workplace deep-dive · 100 04W CUT 06 SAD 04W

Section 7 · 11 inspections analysed

AMBER · 91.4%
← Back
Compliance
91.4%
232 checks
Risk level
AMBER
Deteriorating
Audits
11
Across 10 weeks
Failures
20
Repeat failures
6
KPIs failing 2+ times
Open actions
0
Closure rate
0%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

!
Is the sidewall support vetical distance to footwall to standard?
Support Design
5 fails
Is the excavation height to standard?
Mine Design
4 fails
Is the latest Rock Engineering and Seismic Rating reports displayed on the notice board?
Waiting place to Development End
3 fails
!
Is the last line of secondary support within standard distance from the end face?
Support Design
2 fails
Are the leads/lags between ends within standard?
Mine Design
2 fails
!
Is the spacing between long anchors to standard?
Support Design
2 fails
Are all faults demarcated?
Geology
1 fails
Is the excavation width to standard?
Mine Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

0 open · escalate to Operations Manager

StatusKPISubtaskDueAge
No open actions.