Workplace deep-dive · 100 2AW CUT 3 ACC 05W

Section 8 · 3 inspections analysed

RED · 75.8%
← Back
Compliance
75.8%
62 checks
Risk level
RED
Stable
Audits
3
Across 3 weeks
Failures
15
Repeat failures
5
KPIs failing 2+ times
Open actions
0
Closure rate
0%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

Are all the excavations, including bullnoses, supported to standard?
Waiting place to Development End
3 fails
!
Has all significantly damaged and/or corroded support units been replaced?
Support Design
3 fails
!
Is the sidewall support vetical distance to footwall to standard?
Support Design
2 fails
Are all breakaways supported as per the mine standard?
Waiting place to Development End
2 fails
!
Are the face, hangingwall and sidewalls watered down and barred solid?
Support Design
2 fails
Is the excavation height to standard?
Mine Design
1 fails
!
Is the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)
Support Design
1 fails
!
Have long anchors been installed at planned breakaway and/or planned holing positions?
Support Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

0 open · escalate to Operations Manager

StatusKPISubtaskDueAge
No open actions.