Dashboard / 8 / 95 2W CUT 1 DRP 01W

Workplace deep-dive · 95 2W CUT 1 DRP 01W

Section 8 · 4 inspections analysed

AMBER · 92.4%
← Back
Compliance
92.4%
79 checks
Risk level
AMBER
Deteriorating
Audits
4
Across 4 weeks
Failures
6
Repeat failures
1
KPIs failing 2+ times
Open actions
3
Closure rate
50%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

!
Is the last line of secondary support within standard distance from the end face?
Support Design
2 fails
Is the excavation height to standard?
Mine Design
1 fails
Are all the excavations, including bullnoses, supported to standard?
Waiting place to Development End
1 fails
!
Is the sidewall support vetical distance to footwall to standard?
Support Design
1 fails
!
Has all significantly damaged and/or corroded support units been replaced?
Support Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

3 open · escalate to Operations Manager

StatusKPISubtaskDueAge
OpenIs the sidewall support vetical distance to footwall to standard?Support Design2026-06-020d
OpenHas all significantly damaged and/or corroded support units been replaced?Support Design2026-06-020d
OpenAre all the excavations, including bullnoses, supported to standard?Waiting place to Development End2026-06-090d