Dashboard / 8 / 100 2BW CUT 3 ACC 03W

Workplace deep-dive · 100 2BW CUT 3 ACC 03W

Section 8 · 7 inspections analysed

AMBER · 93.5%
← Back
Compliance
93.5%
138 checks
Risk level
AMBER
Deteriorating
Audits
7
Across 7 weeks
Failures
9
Repeat failures
2
KPIs failing 2+ times
Open actions
5
Closure rate
56%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

!
Are the face, hangingwall and sidewalls watered down and barred solid?
Support Design
3 fails
!
Is the sidewall support vetical distance to footwall to standard?
Support Design
3 fails
Is the excavation height to standard?
Mine Design
1 fails
!
Have long anchors been installed at intersections?
Support Design
1 fails
!
Is the last line of secondary support within standard distance from the end face?
Support Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

5 open · escalate to Operations Manager

StatusKPISubtaskDueAge
OpenAre the face, hangingwall and sidewalls watered down and barred solid?Support Design2026-05-267d
OpenIs the sidewall support vetical distance to footwall to standard?Support Design2026-05-267d
OpenIs the last line of secondary support within standard distance from the end face?Support Design2026-05-267d
OpenAre the face, hangingwall and sidewalls watered down and barred solid?Support Design2026-06-020d
OpenIs the sidewall support vetical distance to footwall to standard?Support Design2026-06-020d