Dashboard / Section 2 / 90 1BW CUT1 ACC 3W

Workplace deep-dive · 90 1BW CUT1 ACC 3W

Section Section 2 · 6 inspections analysed

AMBER · 86.6%
← Back
Compliance
86.6%
119 checks
Risk level
AMBER
Improving
Audits
6
Across 5 weeks
Failures
16
Repeat failures
4
KPIs failing 2+ times
Open actions
0
Closure rate
0%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

Is the excavation width to standard?
Mine Design
4 fails
!
Has all significantly damaged and/or corroded support units been replaced?
Support Design
4 fails
Are all the excavations, including bullnoses, supported to standard?
Waiting place to Development End
3 fails
!
Is the last line of secondary support within standard distance from the end face?
Support Design
3 fails
Are all breakaways supported as per the mine standard?
Waiting place to Development End
1 fails
!
Is the spacing between long anchors to standard?
Support Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

0 open · escalate to Operations Manager

StatusKPISubtaskDueAge
No open actions.