Workplace deep-dive · 95 1W CUT3 ACC 16W

Section Section 2 · 1 inspections analysed

RED · 81.3%
← Back
Compliance
81.3%
16 checks
Risk level
RED
Stable
Audits
1
Across 1 weeks
Failures
3
Repeat failures
0
KPIs failing 2+ times
Open actions
3
Closure rate
100%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

Are all breakaways supported as per the mine standard?
Waiting place to Development End
1 fails
Is the excavation width to standard?
Mine Design
1 fails
Is the excavation height to standard?
Mine Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

3 open · escalate to Operations Manager

StatusKPISubtaskDueAge
OpenAre all breakaways supported as per the mine standard?Waiting place to Development End2026-05-3010d
OpenIs the excavation width to standard?Mine Design2026-05-3010d
OpenIs the excavation height to standard?Mine Design2026-05-3010d