Dashboard / Section 2 / 90 1W CUT1 ACC 9W

Workplace deep-dive · 90 1W CUT1 ACC 9W

Section Section 2 · 1 inspections analysed

RED · 80.0%
← Back
Compliance
80.0%
20 checks
Risk level
RED
Stable
Audits
1
Across 1 weeks
Failures
4
Repeat failures
0
KPIs failing 2+ times
Open actions
0
Closure rate
0%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

Are all breakaways supported as per the mine standard?
Waiting place to Development End
1 fails
Is the excavation width to standard?
Mine Design
1 fails
!
Is the last line of secondary support within standard distance from the end face?
Support Design
1 fails
!
Is the spacing between long anchors to standard?
Support Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

0 open · escalate to Operations Manager

StatusKPISubtaskDueAge
No open actions.