Dashboard / Section 2 / 95 1W CUT3 SD 06E1

Workplace deep-dive · 95 1W CUT3 SD 06E1

Section Section 2 · 1 inspections analysed

RED · 76.2%
← Back
Compliance
76.2%
21 checks
Risk level
RED
Stable
Audits
1
Across 1 weeks
Failures
5
Repeat failures
0
KPIs failing 2+ times
Open actions
0
Closure rate
0%

Compliance trend

Weekly compliance for this workplace with RAG thresholds

Audit & failure trend

Inspections conducted and failures recorded by week

Failures by category

Subtask compliance and failure count

Top recurring failures

Highest-risk non-compliances at this workplace

Are all the excavations, including bullnoses, supported to standard?
Waiting place to Development End
1 fails
Are all breakaways supported as per the mine standard?
Waiting place to Development End
1 fails
Is the excavation width to standard?
Mine Design
1 fails
!
Are the face, hangingwall and sidewalls watered down and barred solid?
Support Design
1 fails
!
Is the last line of secondary support within standard distance from the end face?
Support Design
1 fails

Benchmark

Compliance vs section average, mine average, best and worst performers

Open corrective actions

0 open · escalate to Operations Manager

StatusKPISubtaskDueAge
No open actions.